REALHUB is on fire today

Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular features

Community features

Association

Property features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

Excellent opportunity to purchase a 12,700+ square foot property in a desirable north end neighborhood in Palm Beach.
#R10761972

Palm Beach

216 Southland Road

3 Beds

4 Baths

2,825 Sq.Ft.

$7,500,000

MLS#: R10761972

Addiction Rehab Center For Sale. 10 year lease at 50,000 a month triple net (roof exception). Do not Approach tenants. This property is a ONE OF A KING truly with the perfect lakefront setting, permitted zoning and beautiful Private Campus Setting. 8% CAP Investors will LOVE IT !
#F10114930

Pompano Beach

3831 Crystal Lake Drive

None Beds

None Baths

N/A

$7,500,000

MLS#: F10114930

Stunning Modern Key West, This Timeless & Sophisticated Design Was Just Built in 2017 By Double P Construction. The Brilliant Livability & Comfort Of This Residence Makes For A Rare Retreat From A Far Too Stifling World. Generous Floor Plan, Perfect For Indoor & Outdoor Entertainment. 20' Tall Great Rm w/ FP & Bar, Inviting, Open and Airy w/ Gallery Walls, Designer Finishes Throughout. Spacious & Rare Club Room. 2nd From The Point Waterfront W/Raised Seawall, 100' Concrete Dock. & Massive Water View. Limestone Pavers On Patio & Dock. Chef's Kitchen W/ 48" Gas Range, Pantry, Large Center Island, Casual Dining Bar. The Expansive Primary Suite Offers A Palm Beach Spa-Style Bath & Separate Custom Dressing Rooms. 3 Luxurious Ensuite Bedrooms with Custom Closets. 5th Br Is  A Gym.
#B26021870

Fort Lauderdale

2870 NE 24th Place

5 Beds

5 Baths

5,003 Sq.Ft.

$7,500,000

MLS#: B26021870

8-unit CBS building consisting of two 1 bedroom/1 bath units and six studios. Only 1 block from the ocean. Amazing opportunity to own an income-producing property on the island!
#R11028931

Palm Beach

172 N County Road

None Beds

None Baths

3,720 Sq.Ft.

$7,500,000

MLS#: R11028931

One of the largest lots within the perimeter of Pennock Point at 1.6 acres. Private, secluded, completely walled/fenced with gated access, located at the end of the street. Deeper water relative to some of the point lots, making the lift closer to the lands edge. Unincorporated, Palm Beach County overlay. Southerly oriented, facing the wide water views. Come see all the property has to offer you.
#R10854460

Jupiter

5663 Holly Lane

None Beds

None Baths

1.64 acres

$7,500,000

MLS#: R10854460

Introducing the crown jewel of Boca Villas -- a newly constructed architectural residence where elevated design, exceptional craftsmanship, and an unmatched walkable location converge. Built by the renowned Primo Luxury Homes and thoughtfully designed by Ariana Tascione, this extraordinary corner-lot estate is poised to become the crown jewel of the neighborhood. Perfectly positioned just steps from the ocean and moments from The Boca Raton, Mizner Park, Royal Palm Place, and the vibrant shops and five-star dining along East Palmetto Park Road, this residence offers an unparalleled lifestyle where luxury, location, and design converge. Spanning 5,815 square feet under air and 9,344 total square feet, the home showcases five bedrooms, five full and one-half baths, a private office, club room with custom bar, dedicated gym space, and two full laundry rooms for ultimate convenience. One bedroom suite is ideally located on the first level for guests. From the moment you enter, the home reveals a seamless blend of sophisticated architecture and modern elegance. Elevated, designer-selected finishes and exceptional craftsmanship are showcased throughout, with custom detailing, refined materials, and a level of quality rarely found in new construction. Expansive living spaces are enhanced by cove lighting and integrated LED illumination, while walls of glass frame the outdoor living areas and flood the interiors with natural light. The showpiece double-island kitchen is designed for both entertaining and everyday living, complemented by a walk-in butler's pantry offering abundant storage and preparation space. The primary suite is a private retreat featuring two expansive custom closets, spa-inspired baths, and access to one of the home's three oversized balconies, creating a true sanctuary above the city. An all-glass elevator connects every level of the residence, while the upper-level loft offers a versatile gym or sitting lounge, opening to a spectacular balcony complete with a sun-filled solarium. Outdoor living is equally impressive. A resort-style pool and spa anchor the backyard, surrounded by multiple entertaining spaces including a summer kitchen and outdoor barbecue area, ideal for al fresco dining and gatherings year-round. Adding to the home's flexibility is a separate cabana/guest house, perfect for visitors, extended family, or a private retreat. Additional highlights include:  " Three-car garage with expansive driveway " Partially integrated smart home technology " Three oversized balconies for seamless indoor-outdoor living " Club room with full bar designed for entertaining " Corner lot offering exceptional presence and natural light This remarkable residence offers the rare opportunity to own a newly built architectural masterpiece in one of Boca Raton's most desirable walkable neighborhoods -- moments from the beach, world-class dining, and the best of downtown Boca.
#R11168746

Boca Raton

299 NE 7th Street

5 Beds

5 Baths

5,815 Sq.Ft.

$7,500,000

MLS#: R11168746

This 6-acre equestrian estate in Saddle Trail, is a top-tier facility for the professional equestrian, featuring 3 premium barns, with 14,10 & 6 stalls respectively. All have extensive wash/groom stalls, feed rooms and tack rooms  Solid lease income history. The arena is 115' x 215' fiber mix sub-irrigation with an adjacent 1 acre+ turfed grand prix field. The 5 bedroom 3.5 bath pool home has a dedicated entrance, currently utilized as grooms' quarters, it has potential for a large family home. In total the property has 4 different entrances and great flow. The owners lounge with bathroom & kitchen provides a large social space. 7 large irrigated paddocks and a Kraft 6 horse covered walker. Property sits adjacent tto the horse trail and is a true 15 min hack to WEF.
#R11137238

Wellington

2389 King Terrace

5 Beds

3 Baths

3,781 Sq.Ft.

$7,500,000

MLS#: R11137238

Welcome to 17240 Caretto Court, an exceptional residence in the prestigious Boca Bridges community. This beautifully appointed home offers an elegant blend of sophisticated design, spacious living areas, and seamless indoor-outdoor entertaining. The open-concept floor plan features designer finishes, a gourmet chef's kitchen, luxurious primary suite, and expansive living spaces designed for both comfort and style. Beyond the home, enjoy the unparalleled Boca Bridges lifestyle with a world-class clubhouse, resort-style pool, state-of-the-art fitness center, tennis and pickleball courts, indoor sports court, gourmet restaurant, social lounges, and a vibrant calendar of events. Luxury, convenience, and resort-inspired living come together in one of Boca Raton's most sought-after communities.
#B26037696

Boca Raton

17240 Carretto Court

6 Beds

8 Baths

8,097 Sq.Ft.

$7,500,000

MLS#: B26037696

St. Lucie County is not merely growing; it's thriving, with a projected population increase exceeding 25% in the next decade. This forecast underscores the immense demand for housing and commercial infrastructure, making this acreage a prime candidate for significant appreciation and development. Consisting of approximately 53.65 acres across 7 parcels with utilities nearby. Currently zoned AG-1, this property offers an ideal scenario for re-entitlement, paving the way for increased density and diverse development projects. The availability of utilities nearby further streamlines the development process, reducing initial overhead and accelerating project timelines. It's strategic position provides close proximity to major transportation arteries, including I-95 and US-1, alongside robust existing infrastructure within St. Lucie County. This connectivity is crucial for logistics, resident accessibility, and commercial viability. The property lies just outside of the urban services boundary and is bordered to the east by the new Waterstone Community built by one of Florida's most prominent builders, Adams Homes. Located off the highly accessible Emerson Road corridor. This is more than just land; it's an invitation to shape the future of a dynamic Florida market. Whether your strategy involves a sophisticated re-entitlement plan, a comprehensive land development project, or securing a valuable asset for long-term capital appreciation, this Ft. Pierce acreage represents a definitive investment in prosperity. Don't miss the chance to position yourself at the forefront of Florida's next growth frontier.
#B26015503

Fort Pierce

5562 Russakis Road

None Beds

None Baths

53.65 acres

$7,500,000

MLS#: B26015503

A VERY UNIQUE HIDDEN GEM ON HOLLYWOOD CENTRAL BEACH-ONE OF FLORIDA'S MOST DESIRABLE BEACHES.   3,434 LIVING SQFT. 4,847 TOTAL SQFT.  11,796 SQFT. LOT (NEARLY 1/4 ACRE ON THE OCEAN).  FIRST FLOOR HAS TRAVERTINE TILE, SPACIOUS KITCHEN WITH LARGE ISLAND. KITCHEN HAS AMPLE STORAGE.  ENORMOUS DINING AREA WITH HALF BATHROOM.     MULTIPLE MASTER SUITES.  FIRST LEVEL HAS MASTER SUITE OFF THE LIVING ROOM.  SECOND LEVEL HAS MULTI-PURPOSE ROOM AT TOP OF STAIRS.  MASTER SUITES ON EITHER SIDE OF THIS ROOM.  ALL BEDROOMS FACE THE OCEAN.  SECOND FLOOR, ONE MASTER SUITE HAS LARGE BALCONY OVERLOOKING THE OCEAN.  HOUSE HAS 3 NEW 2025 A/C'S.  ELECRICAL & PLUMBING HAS BEEN UPDATED.  NORMALLY, HOMES OF THIS ERA HAD LATHE AND PLASTER INTERIOR WALLS, THE INTERIOR HAS BEEN COMPLETELY REDONE WITH MODERN SHEETROCK. HEAVY CONCRETE SLAB WITH PILINGS, CRAWL SPACE.  ROOF HAS HEAVY STEEL BEAMS.  VERY WELL BUILT HOME.
#R11133729

Hollywood

4200 N Surf Road

4 Beds

4 Baths

3,434 Sq.Ft.

$7,500,000

MLS#: R11133729

Price reduced
AMAZING OPPORTUNITY TO OWN 43+ ACRES IN THE TOWN OF LOXAHATCHEE GROVES APPROX 875ft OFF SOUTHERN BLVD. MINUTES FROM MAIN ARTERIAL ROADS, PERFECT LOCATION FOR LARGE EQUINE FACILITY, AGRITOURISM  BUSINESS, AGRICULTURAL BUSINESS OR RESIDENTIAL DEVELOPMENT. DESIGNATED BY THE STATE AS A RURAL COMMUNITY. PROPERTY MAY  BE DIVIDED INTO 5 AC FAMILY PARCELS.  CLEARED LAND AWAITING ITS NEW OWNER TO ADD THEIR DREAMS AND IMAGINATION TO THIS AMAZING PROPERTY AND THIS  GROWING TOWN & COMMUNITY. See docs for additional information
#R11015786

Loxahatchee Groves

322 D Road

None Beds

None Baths

43.87 acres

$7,500,000

MLS#: R11015786

Grand Waterfront Estate - This home has it all...Over 150' of water frontage in prestigious Admirals Cove.  6 bedroom, 7.1 baths, 4 car garage, 3 laundry rooms are just the beginning.  Large kitchen open to family room renovated in 2012 with top of the line everything, updated electronics, re-surfaced pool, new flooring and much more.  500' guest suite with full bath, breakfast bar and one bedroom with awesome views of the pool and patio.  The master suite is like no other, his and her full baths with steam shower, large spa tub, exercise room and garage, large custom closets. This pataltial home will not last.
#R10179804

Jupiter

482 Mariner Drive

6 Beds

8 Baths

10,275 Sq.Ft.

$7,500,000

MLS#: R10179804

None
#R11149308

Stuart

2085 SE Saint Lucie Boulevard

4 Beds

4 Baths

5,889 Sq.Ft.

$7,500,000

MLS#: R11149308

One of Palm Beach Point's premiere equestrian facilities situated on almost 16-acres of pristine land and equipped for all of your horse's needs.A stunning walkway leads to 24 spacious and immaculate stalls.Take the elevator upstairs to a three bedroom, two bathroom owners' apartment that boasts high ceilings, marble accents, wood floors, walk-in closets, and a beautiful open balcony.The grooms' apartment offers two bedrooms, 2 bathrooms, and a shared kitchen. Enjoy entertaining and relaxing on the private patio with pool and spa while surrounded by lush landscaping.Completely secure gated compound.
#R10042631

Wellington

14710 Palm Beach Point Boulevard

5 Beds

4 Baths

12,338 Sq.Ft.

$7,500,000

MLS#: R10042631

Welcome to 7226 Ayrshire Lane, a breathtaking designer oasis where luxury meets nature in a serene sanctuary. This fully furnished home is the result of a passionate team of creatives who have meticulously curated every detail, transforming it into a tropical paradise and personal resort.

Enchanting Gardens:

The outdoor space is a true masterpiece, showcasing gardens that have been thoughtfully designed and landscaped to create an enchanting retreat. Over 1,300 square feet of open-air lanais invite you to relax amid lush greenery and vibrant blooms, with every tree and plant carefully selected and nurtured. Meandering stone pathways lead through the verdant landscape, featuring multiple private patios and lounge areas perfect for unwinding or entertaining The gentle sounds of water features, along with tiki torches and fire bowls, enhance the ambiance, making this garden a perfect setting to enjoy the beauty of your surroundings.

Expansive Living Space:

Inside, this exquisite home boasts 4,786 square feet under air and 7,044 square feet in total, featuring 4 bedrooms and 6.5 baths, with each bedroom offering its own ensuite for ultimate privacy and convenience. The seamless integration of indoor and outdoor living creates a harmonious environment that feels both expansive and intimate.

Gourmet Kitchen:

The heart of the home is the gourmet kitchen, a culinary dream with custom cabinetry, marble counters, and top-of-the-line smart appliances, including a SubZero refrigerator, Miele ovens, and a large island with waterfall edge seating. Lighted open shelving and a hidden baker's station add to the kitchen's functionality and elegance.

Luxurious Amenities:

Step into the luxurious newly done saltwater pool, complete with a spa, surrounded by professionally landscaped gardens with stunning views of the second hole on the Palmer Course. The outdoor area also features two tiki torches and fire bowls, creating an ideal setting for entertaining or quiet evenings under the stars.

Designer Finishes:

Every room reflects high-end finishes and custom millwork, with 40x40 porcelain tile throughout and designer lighting by Palecek illuminating the space. The family room, with its custom-built media cabinet, and the dining room featuring a built-in lighted buffet, offer perfect spaces for both formal and casual gatherings.

Thoughtful Details:

The primary suite is a tranquil retreat, featuring a sunken design, sliders to the pool and spa, and two luxurious bathroomsone for him and one for hereach an absolute oasis of comfort and style. These bathrooms boast honed Taj Mahal quartzite countertops, a free-standing tub, and custom cabinetry, ensuring a spa-like experience. Each of the guest bedrooms is designed with comfort in mind, featuring wood-look porcelain tile, built-out closets, and ensuite bathrooms with designer finishes.

Premier Location:

Situated in the esteemed Saint Andrews Country Club in Boca Raton, Florida, this home offers not only luxury but also exclusivity and security. Known for its exceptional golf course, fine dining restaurants, and a world-class spa, Saint Andrews is regarded as the best golf club and community in the area, providing a lifestyle of unparalleled elegance and leisure.

A Harmonious Blend:

At 7226 Ayrshire Lane, every aspectfrom the lush gardens to the thoughtfully designed interiorscreates an unparalleled living experience. This home is more than just a residence; it is a perfect sanctuary where you can escape the ordinary and indulge in the extraordinary. Experience the seamless harmony of luxury and nature in this exquisite designer home.


The information published and provided including but not limited to prices, measurements, square footages, lot sizes, features, finishes, and calculations are subject to errors, omissions or changes without notice.  All such information should be independently verified.  All parties should perform their own due diligence to verify all information.
#R11080687

Boca Raton

7226 Ayrshire Lane

4 Beds

6 Baths

4,786 Sq.Ft.

$7,500,000

MLS#: R11080687

1 ... 213 214 215 216 217 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by Options 1 Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by Options 1 Realty via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.